Learning objectives
- Separate the concepts of biogas cleaning and upgrading.
- Compare water scrubbing, amine absorption, pressure swing adsorption and membranes.
- Calculate methane recovery and CO₂ removal from a material balance.
- Define a preliminary process-design basis with realistic quality and environmental safeguards.
The worked example is deliberately idealized and fully reproducible. It is a learning model, not an equipment bid, pipeline-injection certificate or substitute for a licensed process design.
1. From biogas to biomethane: what changes?
Raw biogas from anaerobic digestion typically contains substantial methane (CH₄) and carbon dioxide (CO₂), together with water vapor and variable hydrogen sulfide (H₂S), oxygen, nitrogen, ammonia, volatile organics and, for some feedstocks, siloxanes. Feed composition changes with substrate, digester operation, leakage and air ingress; it must be measured rather than assumed for an actual project. See the biomass energy fundamentals and biomass conversion technologies for upstream context.
Cleaning removes damaging or specification-limited contaminants such as H₂S, moisture and siloxanes. Upgrading chiefly separates CO₂ to raise the methane mole fraction and fuel heating value per unit of gas volume. Both may be necessary for pipeline injection, compression, liquefaction or vehicle use. A high methane percentage alone is insufficient to certify quality.
Biomethane is chemically methane-rich renewable gas, but the local pipeline operator or applicable fuel standard governs Wobbe index, calorific value, oxygen, water and hydrocarbon dew point, H₂S and total sulfur, particulates, pressure, metering and odorization. Specifications differ by jurisdiction and delivery route. Treat a “97% methane” target in this lesson as an illustrative design assumption, not a universal legal minimum.
Use a dry gas basis consistently; if water vapor is included the mole fraction will differ.
For ideal gases at 0 °C and 101.325 kPa, V_m,N ≈ 22.414 Nm³/kmol. At common temperature and pressure all component volume fractions equal mole fractions.
2. Specify the feed gas before selecting equipment
A defensible feed specification covers the minimum, expected and maximum dry flow rates; CH₄, CO₂, O₂ and N₂ composition; moisture and temperature; H₂S and sulfur compounds; siloxanes and VOCs; particulates and aerosols; operating pressure; and expected seasonal variation. Trace components are not represented in the simplified two-component balance later in this article.
Take representative samples using calibrated instruments, log feed-flow transients, and define analysis uncertainty. Establish whether the “Nm³” contract means 0 °C or another reference temperature. Mixing standard and normal cubic meters without conversion can introduce systematic calculation errors.
For an actual gas volume rate at absolute pressure P and absolute temperature T. Include compressibility factor Z for nonideal service and confirm whether gas is wet or dry.
Confirm pressure losses through filters, absorbers, chillers and adsorbent beds. Choose upstream H₂S removal to protect downstream materials and sorbents where required; technology-specific polishing and final dehydration may remain necessary after the CO₂ separator.
3. A complete upgrading process train

Figure 1. Generic upgrading train with a distinct off-gas route. Actual pretreatment order and required equipment are technology-specific.
A practical train can include a knock-out drum and droplet separator, particulate filtration, desulfurization, cooling or drying, gas compression, the primary CO₂ separator, product polishing, and a custody-transfer measurement and analysis skid. Safety systems include leak detection, gas pressure protection, suitable ventilation, flame arresting or isolation where justified, and hazardous-area electrical classification.
The CO₂-rich waste stream must be assessed, not automatically released. It may contain methane, H₂S or other hazardous constituents; depending on local rules and process conditions, use off-gas recycle, energy recovery, oxidation, carbon capture or another permitted treatment. Any methane slip should be metered or reliably estimated for lifecycle accounting.
4. Physical absorption: pressurized water scrubbing
Water scrubbing uses greater physical solubility of CO₂ than CH₄ in water. Compressed biogas contacts descending water in an absorber. CO₂-rich water is depressurized and regenerated, then recirculated or treated. Water carryover, foaming, mineral scaling, water quality, methane dissolved in the rich water and H₂S coabsorption are design issues.
With this definition of k_H, equilibrium dissolved CO₂ concentration c* increases with gas-phase CO₂ partial pressure at fixed temperature. The Henry-constant convention and temperature must always be stated.
A preliminary engineering study should quantify circulation rate, absorber operating pressure, pressure drop, regeneration method, methane recovery and water makeup. Henry’s law alone does not size a packed absorber: film transfer coefficients, effective area, temperature, flooding margin and gas–liquid equilibrium data are needed.
5. Chemical absorption: amine-based CO₂ removal
Amine systems react chemically with CO₂ and regenerate solvent using heat. They can achieve low residual CO₂ when appropriately designed, but require a reboiler or other heat source, corrosion control, solvent management, heat integration, contaminant monitoring and emission control. CO₂ capture is not automatically “free” just because compression can be modest.
Here q_reb is the actual plant-specific reboiler duty per unit mass of captured CO₂; it is not a universal constant.
Solvent selection and corrosion allowance depend on H₂S, oxygen ingress, solvent loading, lean solvent composition and operating temperatures. A rigorous model needs electrolyte/speciation thermodynamics and rate-based mass transfer rather than the simple ideal gas balance used below.
6. Pressure swing adsorption (PSA)
PSA uses adsorbents that preferentially hold CO₂, water and, depending on the material, other species at an elevated adsorption pressure. Depressurization and purge steps regenerate the beds. Multiple vessels provide near-continuous product flow while individual beds cycle through adsorption and regeneration.
Pretreatment to remove H₂S and moisture is frequently critical because strongly adsorbed contaminants reduce adsorbent capacity or compromise regeneration. The engineering specification includes bed sizing, gas superficial velocity, breakthrough margin, valve cycling, purge demand, compressor power and the off-gas methane fraction. Gas loss cannot be inferred from nominal product purity alone.
A first screening quantity: the difference between equilibrium loadings at adsorption and desorption conditions. Real PSA design requires mass-transfer kinetics, cyclic steady-state simulation and safety margins.
7. Membrane separation and multistage design
Gas-separation membranes typically allow CO₂ to permeate more readily than CH₄ under a partial-pressure driving force, producing a methane-enriched retentate. The CO₂-rich permeate can contain valuable methane. Multistage arrangements and permeate recycle can improve recovery, but increase compression requirements and complexity.
Ideal membrane selectivity is a property ratio, not the same as product methane purity or plant methane recovery.
Permeance Π_i links component flux to a partial-pressure difference. A real module requires local compositions, pressure variation, polarization and membrane-area integration.
For a single membrane stage, the permeate-to-feed reference volumetric flow fraction, not a methane-loss percentage.
Material selection must address water condensation, oil aerosols, H₂S compatibility and pressure/temperature envelopes. A single nominal membrane selectivity does not predict 97% methane purity and 98.5% recovery; those are process-level assumptions for the worked example.
8. Technology selection: fit the process to the feed and outlet

Figure 2. Conceptual selection matrix: separation principle and key engineering decisions. It intentionally avoids unverified universal performance or price rankings.
Screen technology against the site-specific envelope: feed rate and variation, contaminants, desired delivery pressure, required gas specification, electricity and usable heat, water and wastewater limits, operator capacity, vendor guarantees and achievable methane recovery. Ask for guarantees at guaranteed feed composition extremes, not a single ideal feed.
For a rigorous comparison use net present cost and emissions under consistent boundaries. A high recovery at the separator may be offset by upstream leaks, dryer vents or maintenance flaring. Equipment performance values reported by different studies are often not directly comparable because flows, pretreatment and emissions boundaries differ.
9. Worked example: methane recovery and dry gas material balance
Design basis: dry biogas feed 100.00 Nm³/h at 0 °C and 101.325 kPa. Composition 60.00 mol% CH₄ and 40.00 mol% CO₂. Ignore H₂S, H₂O, N₂ and O₂ solely for this teaching calculation; treat those separately in actual plant design. Assume a combined upgrading train achieves 98.5% CH₄ recovery and 97.0 mol% CH₄ in the dry product. Use ideal-gas mixing at identical reference conditions.
Feed CH₄ from dry feed rate multiplied by its dry mole fraction.
Feed CO₂ on the same dry normalized basis.
Methane recovery is the fraction of methane entering the upgrading boundary that leaves in the biomethane product.
Recovered methane entering the dry product stream.
Do not multiply feed flow directly by methane product purity: purity and recovery are different concepts.
The product is assumed to contain only CH₄ and CO₂ on this model basis.
Apply conservation independently to methane and carbon dioxide; no chemical reaction occurs across this separator model.
Off-gas components are 0.9000 Nm³/h CH₄ and 38.1722 Nm³/h CO₂.

Figure 3. Dry two-component mass balance. The figure is derived from the bundled executable calculation, not vendor data.
The calculated product is 60.9278 Nm³/h, containing 59.1000 Nm³/h CH₄ and 1.8278 Nm³/h CO₂. The off-gas is 39.0722 Nm³/h, containing 0.9000 Nm³/h CH₄ and 38.1722 Nm³/h CO₂. The two outlet streams add back to exactly 100 Nm³/h on the stated basis.
10. CO₂ removal, methane slip and product purity are not interchangeable
CO₂ removal compares how much CO₂ stays out of the biomethane product. In this two-stream model it equals CO₂ rejected to the off-gas divided by feed CO₂.
The illustrative CO₂ rejection is about 95.43%, distinct from 97% methane product purity.
Methane slip is 1.5% of inlet methane, not 1.5 mol% of total off-gas.
Off-gas is approximately 2.30 mol% CH₄ in this model. This is not the same as methane slip percent.
Methane-rich tail gas is an important operating and greenhouse-gas concern. Reject gas CO₂ may be captured, utilized or released only as allowed by the site permit and after appropriate treatment of methane and other contaminants. Compare process options using measured whole-site methane losses, including compressor seals, vents, downtime and upset conditions.

Figure 4. Algebraic sensitivity of product volume at fixed 60 Nm³/h methane feed. This is not a separation performance map.
For a fixed methane feed, increasing the required methane purity reduces product total volume because less CO₂ may accompany the methane. Higher recovery raises methane throughput. These are accounting identities; whether a chosen membrane, PSA, absorber or hybrid can meet both simultaneously depends on real equipment design and feed conditions.
11. Heating value and process utilities
With CO₂ treated as noncombustible and an illustrative methane LHV of 35.8 MJ/Nm³ at the stated reference condition.
Use methane flow, not total raw biogas flow, when converting to a methane-only lower heating value.
The 3.6 factor converts MJ/h to kW. Rounded result ≈ 587.7 kW on an LHV basis.
If a preliminary study assumes e_el = 0.25 kWh per Nm³ dry feed, electricity = 25 kW. This assumption is not a universal measured benchmark; real utility use includes compression, refrigeration, pumps and treatment.
At the assumed specific electricity of 0.25 kWh/Nm³ feed, the plant requires 25.0 kW electricity, equivalent to approximately 4.25% of the biomethane product LHV power as a simple energy-rate ratio. It is not net efficiency: the numerator is electricity and the denominator is fuel thermal energy, while thermal regeneration, auxiliary use and off-gas treatment are omitted.
If the upgrading equipment operates for an assumed 8,000 hours each year, the product volume is 487,423 Nm³/year, with approximately 4,701.7 MWh/year of methane LHV. These are energy-throughput calculations, not verified saleable pipeline energy or annual revenue.
Using 16.043 kg/kmol and 22.414 Nm³/kmol, methane in off-gas is approximately 0.644 kg/h.
The modeled tail-gas methane is 0.644 kg/h, or approximately 5.15 tonnes/year at 8,000 hours. This is a material loss, not necessarily an atmospheric emission: recovered, combusted and directly vented tail gas have different actual emissions. Do not apply a greenhouse-warming factor without defining the accounting boundary and assessment horizon.
12. Preliminary process design and equipment interfaces
Step A, feed envelope: document average and peak flow, contaminants, composition, water dew point, temperature, current pressure and availability. Define reference conditions on every flow sheet. Set inlet sampling points and analytical accuracy requirements.
Step B, specification: obtain actual end-user or pipeline acceptance limits for methane-related properties, Wobbe index, oxygen, H₂S, sulfur, water dew point, particulate, temperature and pressure. A gas-quality analyzer cannot substitute for a contractual specification.
Step C, process simulation: develop a validated thermodynamic and rate-based model for selected scrubbing, adsorption or membrane systems. Include multicomponent impurities, cycle behavior, membrane stage cuts, recycle and compressor discharge temperatures. Size tanks, towers, dryers and piping from site data, not the simplified worked example.
Step D, recovery and utility balance: calculate inlet-to-product methane recovery, tail gas composition, utility supply, heat recovery, cleaning chemical make-up and planned maintenance downtime. Specify vendor performance guarantees under minimum and maximum conditions.
Step E, safety and control: carry out HAZOP or an equivalent hazard study. Consider oxygen ingress and explosive mixtures, H₂S toxicity, confined spaces, high-pressure machinery, flare or thermal oxidizer requirements, pressure relief, automatic diversion of off-spec gas, alarms and emergency shutdown logic.
Step F, environmental and economic evaluation: monitor methane leakage across the whole system, define off-gas treatment, quantify CO₂ fate and account for upstream emissions. For economics include feed-gas availability, utility tariffs, compression, adsorbent or solvent replacement, water/wastewater, uptime, QA instrumentation and site-specific market contracts.
13. Common calculation mistakes
Confusing product purity with recovery: 97% methane purity means 97 moles CH₄ per 100 moles dry product. It does not mean that 97% of inlet methane was recovered.
Using wet gas flow in a dry-gas balance: first remove or explicitly include water vapor, and maintain identical reference temperature and pressure for all normalized volumes.
Ignoring methane in CO₂-rich off-gas: even a small methane fraction can be environmentally and economically significant at high gas flow. Include startup, shutdown and upset events.
Treating methane content as a complete quality standard: grid injection also involves dew points, contaminants, calorific properties and delivery pressure; requirements differ by location.
Double-counting CO₂ capture: separating CO₂ does not establish permanent sequestration. Distinguish captured, sold, used, vented and stored CO₂, and account for process emissions and energy sources.
14. Practice problems
Problem 1: A dry 150 Nm³/h feed contains 58 mol% CH₄. If recovery is 99.0% and product purity is 96.0%, calculate methane and total dry product flows. Solution: methane feed = 87.0; methane product = 86.13; dry product = 86.13/0.96 = 89.7188 Nm³/h.
Problem 2: For the main worked example, calculate CO₂ in the off-gas. Solution: 40.0000 − 1.8278 = 38.1722 Nm³/h. Explain why this is not 40% of the off-gas.
Problem 3: Calculate product CH₄ if the main example operated at only 96% recovery with the same feed and 97% purity. Solution: product CH₄ = 57.60 Nm³/h; product flow = 59.3814 Nm³/h. Product flow falls despite unchanged product purity.
Problem 4: At 0.20 kWh/Nm³ dry feed, find the electrical requirement for 150 Nm³/h feed. Solution: 30 kW before other uncounted plant loads. State why a vendor utility guarantee would be necessary.
15. Key takeaways
A good biomethane-upgrading design begins with a verified feed envelope and an explicit product specification. The CO₂ removal unit is only one part of the process: upstream gas cleaning, compression, product polishing, methane-loss management and safety instrumentation all matter. Keep CH₄ purity, CH₄ recovery and CO₂ removal distinct, and enforce component conservation in every proposed flowsheet.
The worked model produces approximately 60.93 Nm³/h of dry biomethane at 97% CH₄ from 100 Nm³/h of dry biogas, with 98.5% methane recovery. The exact result depends on the stated hypothetical assumptions and does not predict a particular commercial unit.
Continue learning
For related engineering foundations, see Biomass Energy Calculations, How Biomass Is Converted into Energy, and Biomass Combustion Engineering.
References and further reading
1. International Energy Agency (2025): Outlook for Biogas and Biomethane. Systems-level context, feedstocks, costs and methane emissions.
2. IEA: Introduction to biogas and biomethane. Defines biomethane upgrading and common CO₂ separation methods.
3. US EPA AgSTAR: Biogas System Operator Guidebook. Biogas cleaning, upgrading, safety and operating requirements.
4. US EPA AgSTAR: Project Development Handbook. Plant development, economics and practical project screening.
5. IEA Bioenergy Task 37: The Role of Biogas and Biomethane (2022). Sustainability and pathways for biomethane use.
6. IEA Bioenergy Task 37: Methane Slip in Biogas Upgrading (2023). Methane losses and options for methane-slip reduction.
7. IEA Bioenergy: Reduction of Methane Emissions (2025). Methane emissions management and tail gas treatment.
8. European Biogas Association: Greening Gas Grids and Biomethane Grid Connection. Grid quality, metering and commercial upgrading approaches.
9. LNEG Biomethane Portal: Purification Technologies. A public-sector overview of cleaning versus upgrading and technology options.
Technical discussions describe general principles; site-specific engineering decisions require appropriate professional evaluation.