Renewable Energy Economics & Finance Engineering Suite

Five learning modules covering generation LCOE, battery storage economics, project finance and green hydrogen. Explore transparent calculations, inspect interactive charts and export preliminary screening results.

v2.3 · Branded exports
Local browser calculations · No user data uploaded

PRACTICAL ENGINEERING EXAMPLES

Five worked use cases

Choose a case to load its illustrative inputs and explore the corresponding calculator. Adjust parameters and compare your results.

Model limitations ↗
CASE 01LCOE · Solar

Utility solar LCOE

250 MW solar farm

Discounted cost per MWh with degradation and a simplified upfront capital offset.

≈ $26.11/MWh
CASE 02LCOE · Wind

Offshore wind LCOE

800 MW offshore wind

Compare a higher-capital-cost wind project under a 48% illustrative capacity factor.

≈ $89.31/MWh
CASE 03Battery storage

Battery LCOS & dispatch

100 MW / 400 MWh LFP

Examine energy losses, SOC-limited daily dispatch and lifetime LCOS.

≈ $150.91/MWh
CASE 04Project finance

PPA and debt coverage

180 MW equivalent financing

Explore equity IRR, NPV and minimum DSCR for a debt-financed renewable project.

≈ 18.53% equity IRR
CASE 05Green hydrogen

Renewable hydrogen cost

120 MW PEM electrolyzer

Model hourly renewable supply, electrolyzer utilization and levelized hydrogen costs.

≈ $2.96/kg H₂

Illustrative, non-market inputs. Case values are reproducible outputs of the screening models, not prices or performance forecasts. See model limitations and technical guidance.

Educational engineering screening: All prices, technology examples, degradation coefficients and renewable profiles are illustrative. Results exclude a number of bankability-level items such as full taxes, resource uncertainty, procurement quotes and financing covenants. Use project-specific data and independent professional review before decisions.
RENEWIOSITY ENGINEERING SERIES • v2.1

Transparent renewable-energy economics

Four reproducible screening models, with explicitly bounded physical and financial assumptions.

← All calculators
01 • GENERATION

Discounted LCOE

$$LCOE=\frac{CAPEX_0 - Grant_0 + \sum_{t=1}^{N} \frac{FOM_t+VOM_t+Decom_t}{(1+r)^t}}{\sum_{t=1}^{N} \frac{E_1(1-d)^{t-1}}{(1+r)^t}}$$

Real-dollar, discounted lifetime cost per discounted MWh. Capacity factor is a first-year generation input, not a guarantee of future production. Incentive field is a simple up-front capital offset, NOT a tax-compliant ITC model.

02 • BATTERY

Storage LCOS & SOC

$$LCOS=\frac{CAPEX + \sum_t \frac{OPEX_t+E_{charge,t}P_{charge}}{(1+r)^t}}{\sum_t \frac{E_{discharge,t}}{(1+r)^t}}$$

The daily illustration enforces charge/discharge power, a 10–90% SOC operating window and symmetric conversion efficiencies. Lifetime degradation coefficients are illustrative and chemistry-specific, not warranties or laboratory-validated forecasts.

03 • PROJECT FINANCE

Equity IRR & DSCR

$$DSCR_t=\frac{CFADS_t}{Principal_t+Interest_t} \quad\quad NPV_{eq}=\sum_{t=0}^{N}\frac{CFE_t}{(1+r_e)^t}$$

Consistent annuity debt service, interest, straight-line depreciation and positive-taxable-income cash taxes. Zero-interest debt is handled. IRR returns N/A when cash-flow sign changes do not admit an unambiguous result. No loss carryforward, reserves, sculpting or tax-depreciation schedules.

04 • GREEN HYDROGEN

Hourly resource-constrained LCOH

$$P_{ely,h}=\min(P_{ely,rated}, P_{RE,rated}CF_h) \quad m_{H_2}=\frac{\sum_hP_{ely,h}(1000)}{SEC}$$

Use the synthetic 8760-hour illustrative resource profile or supply 8760 measured/modelled capacity-factor values. Electricity is priced externally; renewable-generator CAPEX is excluded to prevent double counting. No hourly minimum-load, storage or compression model.

References and context: NLR 2025 ATB definitions • NREL SAM storage LCOS methodology • DOE H2A model framework. These are methodological references, not endorsements or certifications. All values displayed are illustrative inputs unless the user supplies verified project data.