Wind Farm Annual Energy Production: Weibull Distribution and Worked Calculations
Learn to estimate gross and net wind-farm annual energy production by combining Weibull wind-speed statistics with a turbine power curve, then accounting for wake, electrical, availability and other losses. Includes an independently reproducible worked example.
Learning objectives
- Interpret Weibull parameters.
- Calculate a turbine’s expected power from a wind-speed distribution.
- Integrate annual energy production (AEP).
- Apply sequential wind-farm losses.
- Explain the limits of a simplified energy-yield estimate.
1. What annual energy production means
Annual energy production (AEP) is the electrical energy expected from a wind turbine or wind farm over a specified year. It is measured in megawatt-hours per year (MWh/year) or gigawatt-hours per year (GWh/year), not in megawatts. A 4 MW turbine is rated to deliver 4 MW under specified operating conditions; it does not deliver that power during every hour of the year.
For a first-pass resource assessment, engineers combine the probability of each hub-height wind speed with the turbine’s power at that speed. They then apply losses and operating constraints to distinguish gross AEP from net AEP. In a bankable project study, site-specific measurements, uncertainty analysis, directional wakes, air-density corrections, curtailment and long-term resource adjustment must also be considered. NREL’s SAM wind-resource guidance makes a similar distinction between distribution-based estimates and time-resolved models.
N is turbine count, rated power is in MW, and T is the number of hours in the selected year; the result is MWh.
Capacity factor is dimensionless and should use net or gross AEP consistently with its stated definition.
2. Describe wind speeds with a Weibull distribution
Wind speed is not constant. An annual histogram of hub-height speeds may be represented by a two-parameter Weibull probability distribution. The shape parameter k is dimensionless; the scale parameter c has units of m/s. DTU’s WAsP software uses the same two-parameter concept, although fitting procedures and directional handling can differ between applications.
The density f(v) has units of (m/s)⁻¹, so f(v) dv is dimensionless probability.
F(v) gives the probability that wind speed does not exceed v.
Use the cumulative distribution for an exact speed-bin probability, rather than multiplying a density by a large bin width.
The gamma function connects scale and shape to the mean wind speed.
When k = 2, the Weibull model becomes a Rayleigh distribution. Larger k values usually imply a narrower wind-speed distribution for the same scale c. Wind farms often use sector-specific distributions because a single all-direction Weibull curve can conceal important differences in direction and wake exposure.

Figure 1. Illustrative Weibull distributions at fixed scale c = 9 m/s. Shape changes the relative frequency of low and high wind speeds.
3. Convert a wind-speed distribution into electrical power
A turbine power curve gives electrical output as a function of wind speed. It includes the cut-in speed below which the machine generates no power, the partial-load region, rated output and the cut-out region. A manufacturer-validated power curve is preferred for real design work; a theoretical cubic curve is only a teaching approximation.
Our fully reproducible example uses an illustrative 4 MW turbine with cut-in speed 3 m/s, rated speed 12 m/s and cut-out speed 25 m/s. The partial-load region is approximated by a cubic expression shifted so power is zero at cut-in and equals 4 MW at rated speed. This is not a manufacturer-certified power curve.
All speeds in this piecewise expression are numerical values in m/s; the rated output is 4 MW.

Figure 2. Assumed power curve for the worked example. Actual turbine power curves differ and may include air-density and control-system corrections.
Do not confuse the wind’s kinetic power, which depends on the cube of wind speed, with the electrical power delivered by a real turbine. Aerodynamic efficiency, control strategy, generator limitations, air density and operational derating change the electrical curve.
4. Derive gross AEP by integrating expected power
At each wind speed, the probability density describes how frequently the wind occurs, while P(v) describes the corresponding turbine output. Their product is an expected-power density. Integrating over all wind speeds gives the mean electrical power for the assumed wind climate.
P(v) is in MW and f(v) is a density in inverse m/s; the integral yields MW.
For a conventional 365-day year T = 8760 h; use 8784 h for a 366-day leap year if appropriate.
This is an idealized gross figure before wake interactions and other farm-level losses.
For numerical work, a speed-bin method is often more convenient than a continuous integral. For bin i, compute the exact probability from the Weibull CDF, select an appropriate representative turbine power and sum the energy contributions. A fine bin width or a properly integrated power curve improves accuracy.
v_i represents the speed used for the power-curve value in bin i; midpoint evaluation is a common simple approximation.

Figure 3. The area under P(v)f(v) equals mean turbine power. Multiplication by annual hours converts the area to gross annual energy.
5. Fully worked example: eight 4 MW turbines
Assumptions. Eight identical 4 MW turbines; Weibull k = 2.0 and c = 9.0 m/s at hub height; the illustrative power curve in Figure 2; 8760 hours per year. Wake loss = 8%, electrical loss = 2.5%, availability loss = 3%, and other losses = 1.5%. These are hypothetical teaching inputs, not measured performance or an investment-grade forecast.
Step 1: Find the mean wind speed. With k = 2, the gamma term is Γ(1.5) ≈ 0.8862269. The expected wind speed is about 7.98 m/s, which is less than the Weibull scale of 9 m/s.
This is the model mean, not a measurement at a real wind-farm site.
Step 2: Integrate the turbine output. The below-cut-in and above-cut-out regions contribute zero. The numerical integral is therefore evaluated over 3–12 m/s using the cubic segment and over 12–25 m/s at 4 MW.
The numerical result uses the exact stated Weibull density and illustrative power curve.
Step 3: Compute gross energy. Multiply mean power by 8760 h/year and then by eight turbines. Note that 1 MW × 1 h = 1 MWh.
One illustrative 4 MW turbine produces approximately 13.17 GWh per year before farm losses.
Eight identical turbines yield about 105.33 GWh/year gross.
Step 4: Apply the losses sequentially. Here, each percentage applies to the energy remaining after the previous loss. Do not simply add the four percentages unless your assessment method explicitly defines a common denominator for all losses.
Each L is a fraction; the loss categories must be nonoverlapping to avoid double counting.
The assumed net AEP is approximately 90.27 GWh/year.
Step 5: Calculate capacity factor. The farm’s rated capacity is 8 × 4 = 32 MW. A 365-day year at continuous rated power would produce 32 × 8760 = 280,320 MWh.
This net capacity factor is consistent with the stated energy and rated capacity.
Answer. The hypothetical eight-turbine wind farm delivers approximately 105.33 GWh/year gross and 90.27 GWh/year net, corresponding to a 32.20% net capacity factor. These values are conditional on the specified resource, curve and losses.

Figure 4. Gross-to-net energy accounting for the hypothetical 32 MW farm. Each bar shows the energy remaining after the indicated loss category.
6. Why the mean wind speed alone is not enough
Two sites can have the same annual mean wind speed but different distributions of low, moderate and high winds. Since turbine electrical output is nonlinear and capped at rated power, their AEP values can differ substantially. Weibull shape k matters as well as scale c; changing only the mean speed while ignoring distribution shape can be misleading.
This third moment relates to wind kinetic power density, but it is not a substitute for integrating the actual electrical power curve.
This is available kinetic power per rotor-swept area; it is not turbine electrical output. Air density ρ is in kg/m³.
For wind-farm siting, wind direction matters too. DTU WAsP distinguishes directional-sector distributions from a single all-sector distribution, and notes that sector aggregation can change predicted production in some wind climates. A single Weibull model cannot reproduce directional wake interactions by itself.
7. Practical considerations before using the result for design
Wind measurements and extrapolation. Check hub-height wind speeds, measurement period, instrument calibration, missing data, shear and long-term representativeness. A single Weibull fit should not replace validated long-term wind-resource analysis.
Power-curve validity. Use a manufacturer-provided or independently tested power curve, apply air-density corrections where justified, and distinguish free-stream from wake-affected inflow.
Wakes and direction. The 8% wake loss used above is an assumed aggregate. Actual losses depend on turbine layout, wind rose, atmospheric stability, terrain and turbine controls. For detailed layouts, use directional wake modelling and appropriate validation.
Electrical, availability and curtailment losses. Model transformer and cable losses, maintenance downtime, grid outages, environmental shutdowns, icing and dispatch curtailment without double counting. OpenOA provides methods to compare energy-yield estimates against operational data.
Uncertainty and P50/P90. The worked example provides one deterministic expected-energy estimate. A financing study must quantify measurement, long-term correction, power-curve, wake and loss uncertainty before reporting exceedance cases such as P50 and P90. AEP alone is not a guarantee of production.
Time resolution. An annual Weibull distribution is useful for an approximate annual energy total. It cannot reproduce chronological output, storage dispatch, ramps or hourly electricity revenue. For those questions, use validated time-series resource data and operational modelling.
8. Reproduce the calculation in Python
The downloadable companion script worked_aep.py in the production package implements the same Weibull density, piecewise turbine power curve, numerical quadrature and sequential losses. It also checks that the results match the published worked example within a stated numerical tolerance.
For a spreadsheet implementation, divide wind speeds into small bins, compute the Weibull probability of each bin using the CDF, multiply by the turbine power at the bin midpoint, sum the expected power, and then apply annual hours and loss factors. Reduce bin width until the AEP estimate stabilizes.
9. Check your understanding
Question 1. Why can two sites with the same mean wind speed have different AEP? Answer: Their wind-speed distributions may have different shape parameters, and electrical power is a nonlinear function of wind speed.
Question 2. Why is the sum of 8%, 2.5%, 3% and 1.5% not necessarily the correct net-energy reduction? Answer: Sequential loss fractions act on progressively smaller energy bases; the multiplicative factors must be used consistently.
Question 3. What is the theoretical annual energy of a 32 MW farm at continuous rated output for 8760 hours? Answer: 280,320 MWh/year, or 280.32 GWh/year.
Question 4. Why is a Weibull-only model insufficient for time-of-use revenue or storage sizing? Answer: It describes annual speed frequency but does not preserve the chronological sequence of generation.
10. Continue learning
To connect this calculation with turbine performance, read Wind Turbine Power Curves and Capacity Factor Explained. To understand wake losses and spacing assumptions, continue with Wind Farm Layout Design: Wake Effects, Turbine Spacing and Energy Losses.
References and further reading
The sources below support the statistical and engineering methods discussed here. The numerical example, simplified turbine power curve and technical figures are original teaching illustrations, not measurements or manufacturer data.
1. DTU WAsP: Weibull representation of wind-speed distributions. Two-parameter Weibull representation, scale and shape.
2. DTU WAsP: Wind distribution and annual energy production. Directional-sector distributions and AEP.
3. NREL System Advisor Model: Wind Resource. Wind-speed Weibull and measured wind-resource inputs; limitations for time-series studies.
4. NLR Annual Technology Baseline 2025: Land-Based Wind. Capacity factor, loss considerations and Weibull-based estimates.
5. OpenOA: Analysis Methods. Energy-yield assessment versus operational assessment; availability and electrical losses.
6. Wind Energy Model Evaluation Protocol: Wind Conditions. Wind-resource and directional frequency-distribution terminology.
7. NREL: Cost of Wind Energy Review (2024). Illustrative gross/net energy, capacity factor and losses in an engineering cost review.
8. Global Wind Atlas. Screening-level spatial wind-resource information; not a substitute for measured bankable data.
9. DTU wind-energy student worked AEP methodology. Worked example combining wind-speed distribution and power curve.
Technical discussions describe general principles; site-specific engineering decisions require appropriate professional evaluation.