Why round-trip efficiency alone does not tell the full story
A battery can return most of the electricity used to charge it yet become less economical as its usable capacity fades or its operating costs rise. Engineering decisions therefore require three linked calculations: round-trip efficiency to describe energy losses, degradation to estimate future deliverable energy, and lifecycle cost to relate all expenses to useful energy delivered over time.
This guide builds a consistent accounting boundary around the battery energy storage system (BESS), develops worked AC-energy and capacity-retention examples, and ends with a discounted levelized cost of storage (LCOS) calculation. All numerical project inputs are illustrative teaching assumptions, not technology-average guarantees or current procurement quotations.
Learning objectives
- Distinguish DC battery efficiency from AC-to-AC plant efficiency.
- Calculate returned energy and operating losses.
- Identify energy-relevant auxiliary loads.
- Use a transparent capacity-retention model.
- Estimate useful lifetime throughput.
- Distinguish fixed costs from charging-energy expenses.
- Calculate discounted LCOS with correct units and timing.
1. Choose an energy boundary before computing efficiency
Round-trip efficiency (RTE) compares delivered energy with the electricity received during a complete charge-and-discharge event. The measurement boundary matters: a cell-level DC test excludes the inverter and site heating or cooling, whereas a grid-interconnection AC-to-AC assessment can include bidirectional power conversion, transformers, battery auxiliaries and standby loads. PNNL explicitly defines RTE at the grid connection over a cycle returning to the same state of charge (SOC).
Both energies must refer to the same connection point, operating boundary and completed cycle. Multiply by 100 to report a percentage.
If 1,200 kWh enter a storage system at its AC meter and 1,020 kWh return to that meter, the measured AC-to-AC RTE is 1,020/1,200 = 85%; 180 kWh did not return as useful metered discharge. The energy difference includes every loss inside the selected meter boundary, not necessarily just resistive losses in the battery cells.
The difference is 180 kWh in the worked case. It must not be represented as an instantaneous power loss without dividing by time.

Figure 1. An AC-metered storage cycle returns 1,020 kWh from 1,200 kWh received, for an illustrative 85% round-trip efficiency; intermediate allocations are examples, not measured device efficiencies.
2. How charging, discharging and auxiliary losses combine
A simplified component method multiplies the efficiency of each non-overlapping stage, provided each factor is defined consistently. For instance, a charging path at 94%, a discharge path at 94%, and a separate net retention factor of 96% produce an AC-to-AC result of approximately 84.8%. The auxiliary factor represents energy outside the two conversion efficiencies and is illustrative, so it should not be added again if it is already included in a measured system RTE.
For 0.94 × 0.94 × 0.96, efficiency is 0.848256, or 84.83%, under this simplified accounting convention.
Actual heating, ventilation, air conditioning, pumps, controls, and idle power may depend on ambient temperature, state of charge, dwell time and operating pattern. A constant percentage auxiliary factor is a convenient teaching approximation but not a substitute for time-series site data. Efficiency can also change with charge/discharge power and temperature.
Battery-only versus plant-level numbers
A vendor may advertise DC battery efficiency, PCS conversion efficiency, or AC-to-AC efficiency. Do not compare these percentages without harmonizing their boundaries. If a specification already quotes an AC-to-AC RTE with auxiliaries, multiplying it again by inverter efficiency or HVAC losses will double-count those losses.
3. Worked example: energy available after charging
Suppose an operator has 800 kWh available at the grid meter for charging a battery whose end-to-end RTE is 87% under the duty cycle being studied. The corresponding useful energy returned to the same meter is 800 × 0.87 = 696 kWh, leaving 104 kWh within the charging/discharging loss budget. This is an energy estimate, not a claim that the plant can deliver 696 kW at any instant.
With a common AC boundary, 800 kWh input at 87% RTE yields 696 kWh output.
For repeated operations, allocate grid charging energy to the actual input interval and returned energy to discharge intervals. This is especially important when energy prices vary by hour or when storage is charged using curtailed renewable generation rather than purchased electricity.
4. What battery degradation changes
Degradation describes changing ability to deliver capacity and power over the life of the battery. Calendar aging progresses with elapsed time and storage conditions; cycle aging depends on use, including depth of discharge, temperature, current and dwell conditions. A full engineering model may combine interacting mechanisms rather than simply applying one universal annual percentage. Capacity fade and increased resistance are related but different effects.
State of health is not an energy tariff
State of health (SOH) commonly expresses a remaining measured capacity relative to an agreed beginning-of-life capacity under specified test conditions. An 80% SOH threshold is widely used as a design or contractual milestone in some applications, but it is not a universal physical failure point. Warranty definitions, test temperatures, allowable power and usable SOC range must be consulted.
Energy-based SOH must use the same measurement basis, temperature and test protocol at both times.
For transparent first-pass calculations, a constant fraction of capacity retained per year can be assumed and clearly labeled as a simplified scenario. A 2% annual reduction of the remaining capacity is a multiplicative model; it is not the same as subtracting two percentage points of original capacity each year.
Here d is an assumed fractional annual fade and t is elapsed years; example d = 0.02. This is an illustrative model, not a universal degradation law.

Figure 2. Illustrative 2% annual compounded capacity fade; actual calendar and cycle aging depend on chemistry, operation and environment.
5. Worked example: retained usable capacity at end of life
Consider a 4 MWh nameplate DC storage bank operated over an 85% allowable SOC window, at 80% end-of-life energy SOH and 95% one-way discharge-path efficiency. Assuming the three factors can be applied separately at the same specified conditions, the estimate of AC deliverable energy is 4 × 0.85 × 0.80 × 0.95 = 2.584 MWh.
The formula is a screening estimate. Never substitute round-trip efficiency for one-way discharge efficiency.
At beginning of life, the same nominal unit would supply approximately 4 × 0.85 × 1.00 × 0.95 = 3.230 MWh under these assumptions. The difference is 0.646 MWh per comparable discharge event. A design requiring a minimum of 3 MWh at end of life would need more installed capacity or augmentation.
6. Battery bank sizing at end of life
A project requiring 3.0 MWh of AC output per event at end of life, with the same 85% SOC window, 80% SOH and 95% one-way delivery efficiency, needs an initial DC energy nameplate of at least 3/(0.85 × 0.80 × 0.95) = 4.644 MWh, before any additional design allowances. The power rating, current limits and thermal derating must be evaluated separately.
Sizing equation for a specified discharge-side boundary; 3 MWh requires about 4.644 MWh DC in the stated illustrative scenario.
This design estimate should be tested against practical operating constraints: maximum AC discharge kW, duration, reserve SOC, temperature limits, aging changes in resistance, emergency shutoff and battery-management-system power restrictions. A system that passes the kWh requirement may still fail the required kW rating.
7. Throughput, equivalent full cycles and operating duty
Throughput is delivered energy accumulated over cycles, usually measured as kWh, MWh or GWh. Equivalent full cycles (EFC) are helpful for comparing usage patterns, but their definition must specify whether it is based on charging, discharging, or both and which reference capacity is used. Here we define one delivered-energy equivalent full cycle as AC output equal to one beginning-of-life reference AC discharge energy.
The denominator is a declared fixed reference energy, not a silently changing yearly SOH-adjusted capacity.
Under a simplified model with 300 operating cycles per year, 1.00 MWh AC returned per cycle in year one and 2% annual retention loss, year two delivers 300 × 0.98 = 294 MWh and year fifteen delivers about 226 MWh. The model assumes the same cycling schedule and excludes augmentation and outages.
For yearly constant 300 cycles and 2% fade, year y delivery falls exponentially; energy units remain MWh/year.

Figure 3. Annual discharge throughput declines in a no-augmentation scenario with fixed cycling frequency and compounded capacity fade.
8. Cumulative delivered energy over the service life
The simple throughput model gives a geometric sum for lifetime AC output. If cycling and year-one discharge energy are constant, 300 MWh times the 15-year geometric retention sum is approximately 3,921.5 MWh. This is undiscounted physical energy, not a financial present value.
Annual degradation is applied to discharge output in this illustrative model. Changes in efficiency, maintenance downtime, augmentation and dispatch would alter the result.
It is tempting to multiply beginning-of-life annual output by the project life, but that would overstate output in this no-augmentation scenario. For 300 MWh/year and 15 years, the no-fade calculation would give 4,500 MWh; the simplified faded calculation is lower. At the same time, a maintenance or augmentation plan could restore energy capacity at additional cost.
9. What is levelized cost of storage?
LCOS compares the discounted cost of owning and operating storage with the discounted useful electricity discharged over its economic life. It uses $/kWh delivered, not $/kWh of installed nameplate capacity. PNNL highlights that calendar life, cycle life, DOD, maintenance, replacements, financing and discharge throughput all influence an LCOS calculation.
The boundary matters just as it does for RTE. An LCOS estimate may include charging energy, taxes, financing, residual value, land, grid tariffs, insurance, recycling and decommissioning, or omit some of them. Two LCOS values should not be compared unless their cost boundary, discount rate, currencies and operational assumptions are aligned.
C0 is upfront capital cost; S is any residual value or credit at that year; all costs in consistent currency and discounted output in kWh. Explicitly list omitted categories.
10. The distinction between energy CAPEX and power CAPEX
Battery engineering reports often quote costs in $/kWh, but a full system has storage-block expenses that scale with energy (kWh) and conversion/connection expenses that scale with power (kW). For a fixed 1 MW system, extending duration from two to four hours increases energy capacity, yet does not necessarily double the inverter and interconnection cost. NREL ATB illustrates why cost should be separated into energy and power components.
The three terms represent energy-dependent installed cost, power-dependent installed cost and fixed or project-specific cost. Use consistent units for cE ($/kWh) and cP ($/kW).
11. Worked LCOS example: transparent illustrative assumptions
Consider a hypothetical storage project with an upfront capital outlay of $450,000, 15 operating years, 8% annual real discount rate, 300 cycles/year, initial discharge of 1,000 kWh AC per cycle, and 2% annual capacity fade. Assume a constant 85% AC-to-AC RTE for charging energy and a charging-electricity price of $0.045 per input kWh. Fixed operations and maintenance is $9,000 paid each year, with one $80,000 augmentation expense at the end of year nine.
All costs are treated in constant real U.S. dollars. This worked calculation excludes taxes, financing structure, escalation, downtime, salvage, land, grid charges and final decommissioning unless stated otherwise. It is designed to teach the method, not to represent a market quotation or benchmark LCOS.
Annual energy and charging-electricity expense
In year one, 300 cycles × 1,000 kWh/cycle yields 300,000 kWh AC. At 85% RTE the charging meter receives 300,000/0.85 = 352,941.2 kWh, which costs $15,882.35 at $0.045/kWh. With this model, the charging expense falls as discharged energy fades because both the annual cycle count and assumed RTE stay constant.
Use this only when RTE was measured over the same AC boundary. Charging electricity and returned electricity must be counted in the correct years.
The charging price is per input kWh, not per delivered kWh. If the input cost is zero, set the price to zero explicitly rather than hiding the assumption.
Discounted delivered energy and cost numerator
Using the stated 15-year scenario, the discounted discharge-energy denominator is approximately 2,301,517 kWh. The discounted capital, annual O&M and year-nine augmentation together total approximately $567,055 before charging-electricity expenses. All annual year-end flows are divided by 1.08 raised to the appropriate year.
Discounted electricity throughput has units of kWh in present-value equivalents. It is not the same as the undiscounted physical energy delivered.
Because RTE and the charging price are constant in this example, the present value of charging energy cost is simply ($0.045/0.85) times discounted AC output. This produces an illustrative LCOS of about $0.299/kWh delivered. That figure changes materially with cycling, capital costs, charging price, discount rate and replacements.
Simplified special case for constant charging price and round-trip efficiency. Do not add charging losses a second time after dividing input cost by RTE.

Figure 4. Higher electricity-purchase prices increase the LCOS because the required input energy exceeds the useful discharged energy.
12. Sensitivity and the meaning of a cost result
The same storage hardware can have a very different LCOS under a 100-cycle versus 350-cycle annual duty. More cycles increase lifetime useful throughput, although real lifetime degradation can also accelerate with usage. Low-priced surplus renewable energy may make charging less expensive, but the opportunity cost of that electricity and the alternative value of exporting it may still be relevant to project economics.
Likewise, an 8% discount rate does not describe every project. A high discount rate gives less weight to late-life throughput and late-life costs; it may strongly penalize projects whose useful electricity is delivered far into the future. Currency, inflation, real versus nominal rates and the assumed timing of replacement costs must remain consistent.
13. Why augmentation and replacement need their own modeling
A design may augment storage capacity before it reaches a contractual end-of-life minimum, or replace some racks to preserve output duration. Such upgrades incur capital costs but can increase future discharge throughput. Modeling only the replacement cost without the restored energy benefit is pessimistic, while modeling restored capacity without the expenditure is optimistic.
In this worked LCOS example the $80,000 year-nine augmentation is included as a cost but does not restore modeled output; that deliberately conservative assumption keeps the simple degradation figure unchanged. A real feasibility model should explicitly assign any augmentation-supported improvement in operating capability to the corresponding years.
14. Efficiency is not a constant under every dispatch strategy
RTE measured at a high continuous discharge rate may differ from RTE under low-power cycling or long standby periods. At low utilization, fixed auxiliary energy may consume a larger share of throughput. A battery used for frequency support and small partial cycles therefore needs a performance assessment matched to its dispatch, not a single universal battery efficiency number.
15. Avoiding common spreadsheet and design errors
Never mix units: MW is a power rate, MWh is energy, and $/kWh is a cost per unit of useful output. Do not replace one-way discharge efficiency with RTE in a sizing formula; do not subtract fixed kWh auxiliary loads using a percentage without justification; do not combine nominal and real interest rates; do not count cost of charging twice; and never interpret a 2% capacity fade assumption as a guaranteed warranty trajectory.
For presentation, document the measurement point, the initial SOC and final SOC, the charge/discharge times and prices, the power and thermal operating limits, and whether energy is delivered at the battery DC terminals, the PCS AC bus or the grid point of interconnection. These details determine whether independently computed values can legitimately be compared.
16. Practice questions with answers
Practice 1: Compute round-trip efficiency
Question: A BESS receives 950 kWh AC and later exports 798 kWh AC at the same interconnection point. What is its RTE? Answer: 798/950 = 0.84, or 84%, with 152 kWh difference between input and output under that metering boundary.
Practice 2: EOL output capacity
Question: A battery has 5 MWh DC nameplate, a 90% available SOC window, 75% EOL SOH and 94% discharge efficiency. How much AC energy can it supply in the simple model? Answer: 5 × 0.90 × 0.75 × 0.94 = 3.1725 MWh AC, provided the power requirement and operating limits are also met.
Practice 3: Charging cost
Question: A battery delivers 200,000 kWh AC annually at an 80% AC-to-AC RTE. Charging power costs $0.06/input kWh. How much does charging electricity cost annually? Answer: Input is 250,000 kWh; cost is $15,000, or $0.075 per output kWh before capital and O&M.
Practice 4: Compare two LCOS figures
Question: Supplier A reports $0.15/kWh excluding charging purchases; supplier B reports $0.17/kWh including charging purchases. Which is cheaper? Answer: They cannot be compared without harmonizing boundaries, throughput, project lifetime, discounting and charging cost assumptions. The numerical values alone are insufficient.
17. Key takeaways
A credible BESS estimate begins with a clear energy boundary. Round-trip efficiency is the same-boundary output-to-input ratio. Degradation reduces usable energy and can alter discharge capability, while the final lifecycle cost depends on discounted discharge energy, operating expenses and any augmentation or replacement strategy.
A single LCOS value without its assumptions is incomplete. State the cycle count, retention curve, charging tariff, RTE boundary, financial period, discount convention and items included in project cost. For real installations, a validated hourly or subhourly dispatch model and vendor-certified performance information are essential before procurement or construction.
Continue learning
Build on this topic with What Is Energy Storage?, How Battery Energy Storage Systems Work, Battery Energy Storage System Design, and Battery C-Rate, State of Charge and Depth of Discharge Explained. These links connect system design choices with performance and cost calculations.
Sources and further reading
A full linked reference list follows this article in the Wagtail references section. The worked model deliberately uses illustrative project costs, fade rates and pricing; institutional references establish accepted metrics and modeling boundaries rather than endorsing those specific numbers.
For lifecycle studies, record which components the supplier is expected to replace under warranty and which belong to the owner’s operating budget. A contract that guarantees minimum delivered energy may include augmentation within service fees; another contract may assign replacement costs to the project owner. The same physical battery can therefore give different financial results under different contract assumptions.
If the dispatch profile is unknown, report scenario bands rather than a single falsely precise answer. At minimum, test a low-throughput case, a reference operating case and a high-throughput case, then recompute throughput and degradation consistently. Higher use is not automatically more economical, especially if deep cycling increases replacement frequency.
For university exercises, independently recalculate the first and final operating years before trusting a spreadsheet. Cross-check that the first-year charge purchase is 300,000 divided by 0.85 kWh and that the lifetime energy calculation uses the same AC discharge measurement point. These checks frequently expose swapped units, incorrect discount exponents or duplicated loss factors.
Finally, make uncertainty visible: sensitivity plots should display stated ranges for electricity price, round-trip efficiency, fade rate, service lifetime and discount rate, with the assumptions held constant in each comparison. A neat graph is useful only when a reader can reproduce its axes and understand which parameters are fixed.
Technical discussions describe general principles; site-specific engineering decisions require appropriate professional evaluation.